Summary
Three top-lit rooms of different heights, linked by a ramp that doubles as a sculpture court.
The brief
Three top-lit rooms of different heights, linked by a ramp that doubles as a sculpture court. The client asked for a building that would feel generous without being large, and that could be built on a fixed budget.
The section
We started, as always, with one long section through the site. It showed where the light comes from, where people gather and how the structure carries it all. Every later drawing was checked against it.
On site
Construction took fourteen months. 2 300 m² of usable space, finished in 2024 and handed over on the agreed date.