Mill Lane Homes

Type

Housing

Location

Cambridge

Completed

2023

Area

3 800 m²

Width, mm

64 200

Summary

Twenty-four homes around two shared courtyards, each with a front door on the street and a garden at the back.

The brief

Twenty-four homes around two shared courtyards, each with a front door on the street and a garden at the back. The client asked for a building that would feel generous without being large, and that could be built on a fixed budget.

The section

We started, as always, with one long section through the site. It showed where the light comes from, where people gather and how the structure carries it all. Every later drawing was checked against it.

On site

Construction took fourteen months. 3 800 m² of usable space, finished in 2023 and handed over on the agreed date.